July 22

Clearing work still goes on even during youth conference!

We had men show up every day last week to help run our equipment, hand load concrete, and drive the new dump truck.
We have dumped over 200,000 lbs. of concrete!
Donna R., Bobby F. and Gerry M. are also working on drawings that are required for us to submit to the city. (These drawings are not in our architect’s scope of work and their work is helping us to save money!)