July 24

We had a bid meeting with several companies that will provide us temporary power for our site.

  • The bids came back and ranged from $56,000 to less than $8,000.
  • Praise the Lord for Jeff Clark of Temp Power Systems as he will help us save money and work with us on this project.

We especially thank God for our dedicated group of men who have been working hard at removing, breaking and hauling the concrete.

  • They have removed over 500 tons of concrete and debris.

A lady came by who needs several truck loads of dirt mixed with concrete to fill up her swimming pool.

  • This is a blessing because there is much dirt mixed with concrete on the site that needs cleared that requires a lot of hand labor to separate.
  • We do not have to separate it any more because she wants it mixed together.
  • The best part is that she lives around the corner on the 33rd Street making it a very simple hauling job.

Our structural engineer friend, Fred Nour, has agreed to stamp and sign a collection of drawings that needs to be submitted to the Long Beach City Planning Department.

  • He is working with us to save money.
  • Donna Rallonza, Bobby Fabros, and Gerry Maranaan are working on our drawings, and Fred will stamp them for free.