On lot sewer project
- Last week we completed the on lot sewer reroute. The pipe is in and working.
- We will perform a leak test for the inspector this week so he can sign off on it—weather permitting.
Electrical reroute project
- On Saturday we pulled in the 6 new wires that will power our existing building. It was a big job, but praise the Lord for our men. They used their time and talents to help us save tens of thousands of dollars.
- Edison will disconnected their wires, and we can then land ours and power up the building.