Today’s Pictures

There is a picture of the new retaining walls we are working on. We also have the new electrical wiring (silver bars). We were able to put in part of our fire sprinkler system. The elevator pit has been framed. And two pictures of our book store/coffee shop area. We are also working on framing the other side the building as we did in the main entrance. We have our pillars that we will be putting up soon. The elevator ramp is ready to be poured. We have the electrical room on the second floor and the start of the bathrooms on the second floor.