Skip to content
Bro. Rathana instructing Bro. Joel
Bro. Albert Instruction Bro. Joel
Bro. Joel is doing some serious work
Daniel is preparing the steel studs
Bro. Ivan is finishing up the East wall sheathing
Bro. Cody is measuring to prepare for the next step
Bro. Viny working
Bro. Ron Chau working hard
Bro. Sophal
Bro. Gary is putting together the steel studs on the second floor
Team work
Mrs. Sin is painting the stairs
Little helper
Cindy Prin is helping clean the dining area
April is vacuuming the dirt to get ready for the ply wood to go up
The canopy and the arch
Window frames on 33rd
Preparing for the popouts
Working on the arch
The arch