The river rock is fully installed behind the baptistry, making a beautiful accent wall for the platform. Behind that, the men are working on putting in a drop ceiling. In the hallways, they have installed water fountains. Also, the pillars for our platform are on their way, as well as carpet and hardwood flooring. We are looking forward to getting into this new building!