95% of the First Floor

We finally finished framing the exterior walls and we also finished 95% of the interior framing on the first floor. The elevator slab has been poured and the whole second floor has also been poured. We also completed 95% of roof drains. This was all done thanks to the many volunteers we had and the CLAIM men.