November 20

  • We began to backfill the on lot sewer trench.
  • The soil engineer came by to perform a compaction test and gave us some tips on backfilling.
  • Edison poles were removed.
  • Preparations are currently being made to prepare the bed that the gas line will lay in.
  • Brian Sluder from Sword and Trowel Missions came and spent the weekend at our jobsite. He is helping us put together a plan to save us $100,000 on our grading. We are praying that he can come back in a few weeks and get the grading done using our own volunteer men!