The soil engineer came by to perform a compaction test and gave us some tips on backfilling.
Edison poles were removed.
Preparations are currently being made to prepare the bed that the gas line will lay in.
Brian Sluder from Sword and Trowel Missions came and spent the weekend at our jobsite. He is helping us put together a plan to save us $100,000 on our grading. We are praying that he can come back in a few weeks and get the grading done using our own volunteer men!