Skip to content
Concrete being poured
Concrete being leveled
Concrete being smoothed
Rebar for light posts
Concrete poured for trash enclosure
Balcony truss brackets are being installed
Balcony truss brackets
Insulation
Insulation being installed
Parking lot under reconstruction
Planter and island prep begins
Parking lot building entrance
Concrete on 33rd driveway
Phase one of gas-line installation complete
Grass growing, landscape on current building finished
Storm drain hole
Cutting precise measurements for rebar storm drain box
Prayer Request:
- Engineer’s recalculations of gas-line to ensure sufficiency.
- For God to provide a Gym floor in exchange for bleachers we currently own.
- Continued safety of our men.
- Glorifying God together commitments starting June 1st.
Concrete Being poured on 33rd drive way
Drive way on 33rd
Jedd driving the Bobcat
Sidewalk on Magnolia repaired
Landscape of current building completed
View of landscape and the front of the building on Magnolia