Thank you Bro. Houghton for your sacrifice in coming to work on our building!
Filling in the trenches
Men filling in the trenches
View of color coat from 33rd
Clock numbers going up!
The Steeple came in last week!
Baptistry was delivered last week!
How many men does it take to put up the steeple?
Many are excited about our steeple installation!
It stands!
Up it goes!
Reaching on to higher ground!
Here it stands!
Building reaches new heights: the steeple is up!
South side clock
West side clock
View from drive way on 33rd
Last coat of stucco going up (it’s color!)
Power line connected to the building
Men compacting the dirt
Covering up the trench where the conduit was installed
View of ditch from drive way
Electrical line being installed
View of electrical line ditch from 33rd St.
View of ditch from north side of building
Second floor framing 98% complete
Lighting under platform being installed
Ditch being dug
Electrical line extension ditch being dug
View of Foam from 33rd
View from Magnolia
Foam going up
North side of building