Colored Stucco Coating! View from drive way on 33rd Last coat of stucco going up (it’s color!) Power line connected to the building Men compacting the dirt Covering up the trench where the conduit was installed
Electrical Line Extention Electrical line being installed View of ditch from drive way View of electrical line ditch from 33rd St. View of ditch from north side of building
Framing and Electrical Update Second floor framing 98% complete Lighting under platform being installed Ditch being dug Electrical line extension ditch being dug
Brown Coat Complete! Clock Tower is sheathed Framing on second floor is 90% complete Brown Coat on Stucco is complete Framing on second floor Framing on second floor Lighting under platform is installed