View from drive way on 33rd
Last coat of stucco going up (it’s color!)
Power line connected to the building
Men compacting the dirt
Covering up the trench where the conduit was installed
View of electrical line ditch from 33rd St.
View of ditch from drive way
Electrical line being installed
View of ditch from north side of building
Second floor framing 98% complete
Lighting under platform being installed
Ditch being dug
Electrical line extension ditch being dug
View of Foam from 33rd
View from Magnolia
Foam going up
North side of building
Clock Tower is sheathed
Framing on second floor is 90% complete
Brown Coat on Stucco is complete
Framing on second floor
Framing on second floor
Lighting under platform is installed