This week some roof insulation was installed, and one retaining wall was poured.
[vimeo 43287107]
Stay updated on our building progress!
This week some roof insulation was installed, and one retaining wall was poured.
[vimeo 43287107]
Most of this week was spent placing thin metal strips that will hold the insulation (inside the building) and roofing sheets (on top of the building).
Take a look at the new outside rendering for the auditorium. Listen (or watch) the message that Pastor talks about impact the Sandy Creek Baptist Church had.
All renderings new and old can be accessed by going to the “Drawings” page at the top.
It didn’t seem like much was done this week because all of the work this week has been in getting the roof ready. Below are some pictures of what was done.
Take a look at the new rendering for the bookstore. Listen (or watch) the message that Pastor talks about memorials and unveils name for the bookstore.
All renderings new and old can be accessed by going to the “Drawings” page at the top.